Skip to content

Sourcing & Development

From the idea to a productready to manufacture.

Talk to our team
Manufacturer map being reviewed on a tablet
  1. 01
    Team building the product's technical briefing on a glass board

    Technical briefing

    We understand your goals, technical requirements, desired standards and constraints to build a clear specification.

  2. 02
    Manufacturer map being reviewed on a tablet

    Supplier mapping

    We search and map manufacturers aligned to your product, capacity and target market.

  3. 03
    Supplier proposal comparison being analysed

    RFQ & Negotiation

    We send a structured RFQ, compare proposals and negotiate the best overall terms.

  4. 04
    Part being measured with a caliper during sample validation

    Samples & Testing

    We collect samples, run functional tests and validate compliance with your requirements.

  5. 05
    Engineer reviewing the product's three-dimensional model

    Engineering & Adjustments

    We adjust design, materials and processes for performance, cost and manufacturability.

  6. 06
    Packaging resistance test in the laboratory

    Packaging & Validation

    We develop protective packaging and run resistance tests to ensure transport safety.

  7. 07
    Following the pilot run on the assembly line

    Pilot production

    We follow the pilot run, validate quality and release for scale production.

Deliverables
  • Qualified shortlist
  • Technical-commercial comparison
  • Validated sample
  • Production plan
How we choose suppliers
  • CapacityInfrastructure, equipment and workforce.
  • QualityProcesses, controls and performance record.
  • Lead timeLead time, reliability and delivery capacity.
  • CostCompetitiveness and cost transparency.
  • ComplianceStandards, safety and regulatory requirements.
Risks under control
  • QualityClear standards, inspections and tests.
  • DeliveryPlanning, monitoring and contingencies.
  • Foreign exchangeMonitoring and mitigation strategies.
  • ComplianceDocumentation, regulations and market requirements.

Questions about the process

How long from briefing to sample?

For catalogue products with minor adjustments, it usually takes 3 to 5 weeks. Products requiring a new mould or engineering take longer, because the schedule then depends on tooling manufacture. Your specific timeline comes with the shortlist.

How many suppliers do you shortlist?

We work with a shortlist of three to five qualified manufacturers per product. Fewer than that gives no basis for comparison; more than that scatters the negotiation and delays the decision.

Can you represent us in China?

Yes. Our team in Shenzhen conducts visits, audits, negotiation and production follow-up on your behalf, with a report for each interaction. The scope of representation is set out in the contract.

How do you ensure sample quality?

The sample is checked against the approved specification — dimensional, functional and finish — with photographic records and a report. Any divergence becomes a correction request before any release to production.

Start your project in China

At the right time.

Talk to our team